What happened?
Town 22748154-8031-478b-b137-fb2664fcf04d, rig 7bcb6722 (key_digest). PR https://github.com/arthrod/key_digest/pull/1494 cannot merge because the "Kilo Code Review" status check reports the review sandbox is unreachable. The Gastown auto-triage agent (Maple) confirmed this is an infrastructure/sandbox-availability failure, not a code defect in the PR. Because this check is a required gate, every PR is blocked from auto-merging, which stalls the entire serial research convoy (Wave 1 beads W1-1..W1-4 depend on a serial chain). The polecat (Toast) was dispatched a second "address failing CI" fixup bead and would otherwise loop forever trying to fix a non-existent code issue. Steps to repro: any PR merge attempt in this town triggers the Kilo Code Review check which fails with sandbox unreachable. Request: restore the review sandbox, or provide a documented way for the refinery to merge a PR whose only failing check is this infra-unreachable review.
Area
Merge Queue / Refinery
Context
- Town ID: 22748154-8031-478b-b137-fb2664fcf04d
- Agent: Mayor (e2c135c5-a1ba-4e88-959f-b159986a0437)
- Rig ID: 7bcb6722-e076-4beb-86b6-c0dbff583f58
Recent Errors
Escalation 0575bfbe-c421-4cc3-8b6d-cfe04834afe1 (auto-closed): "PR #1494 CI: Kilo Code Review sandbox unreachable (not a code defect)". Triager Maple status_message: "Triage complete — 1 escalated (CI sandbox unreachable, infra issue)". merge_request bead 25f06317 review_decision=null, merge_state_status=null, poll_error_kind=null across polls at 05:29, 05:43, 05:48, 05:49.
Filed automatically by the Mayor via gt_report_bug.
What happened?
Town 22748154-8031-478b-b137-fb2664fcf04d, rig 7bcb6722 (key_digest). PR https://github.com/arthrod/key_digest/pull/1494 cannot merge because the "Kilo Code Review" status check reports the review sandbox is unreachable. The Gastown auto-triage agent (Maple) confirmed this is an infrastructure/sandbox-availability failure, not a code defect in the PR. Because this check is a required gate, every PR is blocked from auto-merging, which stalls the entire serial research convoy (Wave 1 beads W1-1..W1-4 depend on a serial chain). The polecat (Toast) was dispatched a second "address failing CI" fixup bead and would otherwise loop forever trying to fix a non-existent code issue. Steps to repro: any PR merge attempt in this town triggers the Kilo Code Review check which fails with sandbox unreachable. Request: restore the review sandbox, or provide a documented way for the refinery to merge a PR whose only failing check is this infra-unreachable review.
Area
Merge Queue / Refinery
Context
Recent Errors
Filed automatically by the Mayor via
gt_report_bug.