You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Sprint 5 made multi-source ingestion and PM/project setup work; Sprint 6 turns that into something usable and demoable end-to-end. Connecting a GitHub repo becomes a single action (sources enabled-by-default, org/user discovery inside the create-project wizard), the Jira connector reaches the frontend, and onboarding gets its finishing touches — including the AI Buddy as a conversational alternative to the static onboarding checklist (Sprint 5 spike integration). A seeded, non-empty deployment lets us demo the whole flow without manual setup. Capacity is still reduced this sprint, so scope is priority-ordered.
Integrate the AI Buddy (Sprint 5 spike) as an alternative to the sequential onboarding path (AI/Frontend/Backend) — no tracking issue yet, to be created
As a new joiner, choose the AI Buddy instead of the static onboarding checklist and get guided through onboarding conversationally. [Buddy integration — TBD]
Sprint Goal
Sprint 5 made multi-source ingestion and PM/project setup work; Sprint 6 turns that into something usable and demoable end-to-end. Connecting a GitHub repo becomes a single action (sources enabled-by-default, org/user discovery inside the create-project wizard), the Jira connector reaches the frontend, and onboarding gets its finishing touches — including the AI Buddy as a conversational alternative to the static onboarding checklist (Sprint 5 spike integration). A seeded, non-empty deployment lets us demo the whole flow without manual setup. Capacity is still reduced this sprint, so scope is priority-ordered.
In scope
A. Simplified, complete GitHub & Jira ingestion
B. Onboarding — paths, steps & the AI Buddy
C. Knowledge base & chat
D. PM/Admin UX
E. Demoable deployment
Priority / capacity note
Reduced capacity this sprint (carry-over from the Klausur phase). If scope has to slip, land in this order: #265 → #266 → #264 → #259 → #261 → #262 → #239 → #255 → #111 → #54 → #104 → #243 → #257 → #258 → #263.
Demo outcomes (Sprint Review 2026-08-12)