Rebase workflow to resume from Level 18 after confirming Level 17 completion.
- Resume Level 18 progression
- Validate baseline assumptions from Level 17
- Ensure runtime stability before continuing
- Run Level 17 validation suite
- Confirm baseline stability
- Proceed with Level 18 runtime hardening
- Clean transition from Level 17 to Level 18
- Stable baseline for continued development