diff --git a/docs/projects/2608-site-design-system/20-29-strategy/20.06-clean-slate-v2-plan.md b/docs/projects/2608-site-design-system/20-29-strategy/20.06-clean-slate-v2-plan.md index f2d5f4da7..af1cb7d9d 100644 --- a/docs/projects/2608-site-design-system/20-29-strategy/20.06-clean-slate-v2-plan.md +++ b/docs/projects/2608-site-design-system/20-29-strategy/20.06-clean-slate-v2-plan.md @@ -132,8 +132,8 @@ same commit · browser-measured AA + seams on anything touching a rendered page. | Track A: direction 2 (stitch) | DONE — "Institutional Authority", screen `7cbde8e2e694438d82138be4d6f7f3f9`; canon flags in 20.07 | | Track A: Claude Design | project created via DesignSync (`a5f25203-6dd9-45c6-a978-5842152d1389`), seeded with brief + both directions | Paul iterates there; then judging | | Track A: judging board | BLOCKED on Paul's Claude Design pass | /impeccable critic on FABLE + ICP panel, board for Paul | -| PR-1: v2 rail | BLOCKED on PR-0 merge (WIP=1) | execute §PR-1 list verbatim | -| PR-2: styled pilot | BLOCKED on PR-1 + Track A winner | — | +| PR-1: v2 rail | **MERGED** #555 (`703fee12c`) — rail live: `/next/` noindexed staging, qtest holes closed (root layouts + v2 registry-derived keys), ADR-0006, mermaid source-aware. Screenshot job red = the documented 16-key #540 handoff only, verified key-by-key. | — | +| PR-2: styled pilot | BLOCKED on Track A winner only | FIRST task: port `overview`/`faqs` frontmatter sections into `layouts/next/single.html` (the pilot renders 47/536 words until then — ADR-0006 §4); THEN style per the winner; judging = 4-persona panel + fable critic per 20.07 | | PR-3: flip | BLOCKED on PR-2 + Paul live review | — | | 20.05 service-page spec | NOT STARTED (hive specialists idle) | content model (month-one card, decision table, timeline) survives any design winner | | Homepage read gate | WAITING ≈2026-09-17 | first: confirm `e1fa5409d` deploy date |