Skip to content

chore(tracking): SDP Release 25.11.0 #759

Description

@labrenbe

Important

Important dates:

  • 2015-07-30 - Release planning
  • 2025-09-08 - Lock product versions
  • 2025-09-25 - Lock product patch versions
  • 2025-10-24 - Final operator-rs release at CoB
  • 2025-10-27 - Begin bumping operator-rs crates in each operator
  • 2025-11-06 - Begin release-branching tasks (Bumped)
  • 2025-11-14 - Target release date (marketable)

Tip

Replace the items in the task lists below with the applicable Pull Requests / Issues.

Early Pre-release tasks

Tip

These tasks should be done earlier in the process to lessen the burden at Pre-release time.

Pre-release

Tip

These tasks should be done a week or so before the release date.

Release branching

Caution

A small change freeze is required until these tasks have been completed.

Tip

See stackable-utils for script to create tags and update changelogs.

  • Create release branch for docker-images
  • Create release branches for operators
  • Create release branch for demos
  • Wait for images to be built before proceeding

Release candidate testing

Warning

To be discussed during the on-site.

Getting started scripts use particular product versions (this would have been updated in the
early-pre-release stage), however, at this point in time, the images will be tagged with an rcX
tag.

Release tagging

Tip

See stackable-utils for script to create tags and update changelogs.

  • Create release tag(s) for docker-images
  • Create release tag(s) for operators
  • Update release version in changelogs on main branches
  • Wait for images to be built before proceeding
  • Test stackablectl with locally updated (to new release number) releases.yaml
  • chore: Add 25.11.0 release release#39
  • Release stackablectl

Release verification

Tip

These tasks do not block the Documentation tasks below and can be done concurrently.

Documentation tasks

Tip

Name the release-notes branch docs/release-notes-25.11.0 so that the link below takes you directly to the Pull Request template.

Marketing tasks

Note

Marketing material can now reference published documentation.

  • Update the homepage banner (as long as we have it) to point to the new release
  • Write a blogpost / news article announcing the new release (optional)
  • Write a description of new demos for homepage/demos section
  • Announce Release on LinkedIn
  • Announce Release in Newsletter (optional)
  • Post an announcement in the GitHub Discussions Announcement forum and make it a pinned discussion while at the same time removing the old pinned thread
  • Post an announcement in Discord
  • Send announcement to Heiser
  • Ping the stackable-ionos-tech channel or anyone responsible once all tags are created

Post-release tasks

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Labels

Type

Projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions