Skip to content

chore: sync CONTEXT.md with merged PRs #6-#8 - #9

Merged
Ishaan29 merged 1 commit into
mainfrom
chore/context-sync
Jul 15, 2026
Merged

chore: sync CONTEXT.md with merged PRs #6-#8#9
Ishaan29 merged 1 commit into
mainfrom
chore/context-sync

Conversation

@Ishaan29

Copy link
Copy Markdown
Owner

Summary

CONTEXT.md went stale the moment PRs #7 and #8 merged: it listed the maint/* work as "planned, branches not yet created" (it landed via #8) and chore/ai-workflow as pending PR (merged as #7). This syncs it with reality:

  • Branch table trimmed to main + dev; merged branches noted as deletable.
  • Records the e2e benchmark baseline (PR Banchmark #6) and the maintenance merge (PR Banchmark #8) as decisions.
  • "Next up" now carries the two index issues the 100k baseline surfaced as spec candidates: efSearch not clamped to k (recall@100 = 0.40) and the per-result Badger hydration tax in Engine.Search.

Verification performed

  • Docs-only diff (one file). make test-all not rerun for this commit; both CGO modes passed on the identical code state earlier today (PR Chore/ai workflow #7/Banchmark #8 gates).
  • All PR numbers, file paths, and links cross-checked against git log origin/main and the repo tree.

🤖 Generated with Claude Code

The maint/* work and AI-workflow branch landed between CONTEXT.md
revisions, leaving it pointing at 'planned' work that had already
merged. Records the bench baseline decision and the two index issues
the baseline surfaced as next-up spec candidates.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
@Ishaan29
Ishaan29 merged commit 259b6e3 into main Jul 15, 2026
5 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant