Skip to content

Milestones

List view

  • Successor to milestone #18 (closed 2026-07-17 but still actively receiving closed issues through 2026-07-20 — the grab-bag of general self-host correctness bugs, test-coverage gaps, and feature work across apps/**, packages/**, src/**, .github/**, scripts/** never stopped being a real need, it just lost its open home). Created 2026-07-21 after an adversarial re-check found the contributor-available floor had collapsed because this was the only milestone catching ordinary (non-Cloud-Readiness) engineering work and it had no open successor.

    No due date
    65/74 issues closed
  • Recurring home for post-Wave-4/4.5 gap-audit findings in packages/loopover-engine and packages/loopover-miner — correctness bugs, unenforced documented contracts, thin coverage on branchy logic. Same shape/contributor-openness as Wave 4 and 4.5 (both fully closed). Created 2026-07-21 per reference.md's recurring-category milestone-discipline note.

    No due date
    14/15 issues closed
  • Subnet-funded reward-pool model: a Bittensor subnet funds its own reward pool for its own GitHub repo, AMS discovers/does the work, ORB reviews/merges, settlement flows through a layer that keeps gittensor in the path. A candidate resolution path for #4781's open economics-mechanism question — not a replacement for Wave 5's existing tradfi-rental scope, a parallel Bittensor-native track. Maintainer-only planning for now.

    Due by July 31, 2026
    5/7 issues closed
  • Getting everything ready for a live, hosted/cloud version of AMS, fully usable by anyone through our website (expanding our existing dashboard/app, potentially building a mobile app and/or desktop app, CLI version, etc).

    Due by July 24, 2026
    71/75 issues closed
  • Two-phase initiative: first grow @jsonbored/gittensory-engine's ORB-side content into a real, reusable core, then build multi-tenant hosted-offering readiness on top of it — multi-tenancy, fleet ops, scaling, billing, secrets, onboarding, and incident/SLA readiness. See the epic issue for full scope.

    Due by July 24, 2026
    98/113 issues closed
  • A hosted, multi-tenant product: rent gittensor-powered autonomous development-loop time against any repository. See the epic issue for full scope across 7 groups.

    Due by July 24, 2026
    64/80 issues closed