Scope agreed on 2026-10-16

One concrete PBT generation phase is followed by one USVM search phase. No return to random generation is required. Concrete replay and optional shrinking validate a USVM candidate; they are not a second PBT generation phase. This replaces the previous repeated-round acceptance.

Existing implementation

#524 transfers admitted concrete edges into the original-property analysis, uses #526's selector, retains covered prefixes and allocates at least half of turns to the original BFS objective. Keep this implementation; do not replace it with a generic scheduler framework.

Delivery requirements

Acceptance

Independently changed admitted PBT edges change the selected symbolic work. An enabled exact relation independently changes its challenge. Original-property search survives covered code, misleading relations, failed replay and unusable targets. The complete decisions and elapsed costs remain inspectable. No second PBT generation phase is required.

Delivery status (2026-10-17)

Admitted-edge transfer and core selector work are retained and separately owned; this task did not change selector policy. Optional exact one-time relation scheduling is published in #603 on composition #602. Each selected relation is challenged at most once; target roles, decisions, source-qualified confirmations and allocations remain in relationGuidance. A timely native original fault ends auxiliary work and prevents a redundant original query. No second PBT phase, adaptive policy or generic scheduler is introduced.

#610's retained-observation correction and #611's strict auxiliary-receipt consumption are published and integrated in frozen local assembly c447392006cb72b06ead3d857b639a23d7e259c9; 42 focused integration tests passed. Final scalar controls use a common outer 60-second deadline, explicit original-machine cap and actual remaining allocations. All 108 scalar artifacts are timely/eligible. A positive unrestricted-original allocation is retained unless an original fault is already confirmed.

The relation modes find the branching mutant in 3/3 seeds where the four original-objective controls do not, but prefix/native-oracle execution independently reaches the same input without learned equality. Thus scheduling functionality is demonstrated; incremental observation value is not. The completed class comparison has zero gain in all 14 strict paired rows, with 55/144 incomplete cells kept separate. See #357/#404 for results and published #614/#615/#616 under #354/#612/#613 for ordinary command-boundary publication/deadline handling, still pending review/merge with cooperative cleanup limits. All PRs remain open; no main merge or superiority claim is implied.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions