docs(playability): aggregate P1 and define staged P2 - #184
Merged
Conversation
blakinio
marked this pull request as ready for review
August 2, 2026 23:29
blakinio
enabled auto-merge (squash)
August 2, 2026 23:29
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Purpose
Aggregate the four merged and separately archived P1 contract producers, reconcile live architecture/capability/dependency state, and publish the smallest safe staged P2 minimum-visible-world wave.
Delivered scope
WAVE_P2_MINIMUM_VISIBLE_WORLD.md;bc0068ab…evidence versus older runtime descriptor cuts;Material findings
P1-AGG-CANARY-REVISION-001protocol-canarystill names runtime source cuts95b276db…/4b2d6f43…, while the merged P1 generated source index is pinned tobc0068ab….Disposition: P2 CANARY-WORLD-PROTOCOL must mechanically align the development descriptor/tests to the generated index before gameplay parser work, preserve real admission fail-closed and leave unsupported field layouts explicit. The inspected cut is not treated as deployed without controlled evidence.
P1-AGG-M2-ASSET-CLAIM-001Fresh acceptance audit found that the first draft allowed a synthetic visual boundary to be interpreted as sufficient for controlled
M2_PASS.Disposition: repaired. Synthetic visual runs are partial technical evidence only.
M2_PASSrequires an approved compatible appearance source, provenance/rights boundary, exact runtime-pack identity and visibly correct controlled world.Claim boundary
This PR authorizes no Rust implementation, staging access, credentials, deployment, production assets or M2 completion claim. Synthetic visible-world composition remains a partial consumer. M2 requires a separate controlled login -> visible world -> semantic movement -> server reconciliation -> safe logout acceptance on an exact named environment and compatible runtime pack.
Exact-head validation
Windows exact-head validation passed locked metadata, pinned rustfmt, strict workspace Clippy, complete workspace tests and architecture policy. Supply Chain and repository
CI / Requiredpassed.Temporary assertion-guarded workflows removed themselves before the final head:
30772041402: PASS;30772003133: failed only on five new Markdown trailing-space line breaks and was causally repaired before commit;30772143467, job91561025436: PASS.Content audit
Closeout
Ready for protected merge. After merge, create and merge the mandatory separate lifecycle archive; only the archived barrier authorizes launching the first P2 producer.
Task
OTC2-20260803-playability-p1-aggregation