Contributor

The shared cadence is merged in #42. Live canary qualification exposed failures in prepared-source verification, comparator cache restoration, OBS setup/reporting and concurrent source publication. This change corrects those paths and retains the executed observations and verified evidence archives.

  • Verify prepared snapshots against their declared upstream parent, remove REAPI seed metadata before starting bazel-remote, install the required ccache release, and preserve missing OBS cache-hit data as unmeasured.
  • Retry only GitHub's exact concurrent-ref conflict; retain ordinary permission failures. The isolated publication rehearsal now passes conditional commits, independent dispatch, reconciliation and simultaneous writers.
  • Keep case, variant, CLI channel and lane labels consistent. Collect canonical phase records from bundles that also contain native evidence. Preserve split-archive metadata in the catalog.
  • Retain frozen seed/advancement plans and all earlier failed or cancelled cohorts. The qualification review covers 12 cases / 17 rolling targets. All seventeen targets passed both runs. Helix and Zed Nix each passed two fresh samples. All completed observations are collected, with 60 verified qualification/rehearsal archives.
  • Prepare, but do not apply, removal of 48 historical cron triggers in 17 repositories. Central activation remains off pending a compatible stable CLI release and the documented drain/cutover procedure.

Validation: 252 tests / 1,992 assertions pass. Case, registry, workflow boundary, report-contract and Actionlint checks pass. The full hosted source rehearsal passed 24 cases, and the fresh dispatch dry run passed 31 targets. See docs/cadence-qualification-2026-10-05.md and docs/cadence-cutover.md for evidence and remaining gates.

@gauravtiwari gauravtiwari changed the title Verify snapshot recipes and retain cadence qualification evidence Qualify the shared cadence and prepare schedule cutover Oct 5, 2026
@gauravtiwari
gauravtiwari merged commit 56b18b5 into main Oct 5, 2026
1 check passed
@gauravtiwari
gauravtiwari deleted the cadence-qualification branch October 5, 2026 18:27
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant