Skip to content

ref: Remove deprecated packages - #2410

Open
Luca Forstner (lforst) wants to merge 6 commits into
mainfrom
lforst/dum-e/seattle-5dabf8a3b6
Open

ref: Remove deprecated packages#2410
Luca Forstner (lforst) wants to merge 6 commits into
mainfrom
lforst/dum-e/seattle-5dabf8a3b6

Conversation

@lforst

Copy link
Copy Markdown
Member

No description provided.

Copy link
Copy Markdown
Member

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

shouldn't we only do this with the next major?

@lforst

Copy link
Copy Markdown
Member Author

shouldn't we only do this with the next major?

Abhijeet Prasad (@AbhiPrasad) technically it doesn't matter as we just stop publishing right?

@lforst

Copy link
Copy Markdown
Member Author

Abhijeet Prasad (@AbhiPrasad) bump, what do you think ^

Resolve pnpm-lock.yaml by regenerating it from the merged workspace
manifests, preserving the removal of deprecated integration packages and
origin/main's dependency updates.

Validation:
- Frozen-lockfile install, build, type checks, lint, and formatting passed.
- 158 targeted unit tests passed.
- Full e2e replay: 52 files passed, 1600 tests passed, 8 skipped.
- All six changed e2e scenarios passed three replay checks each.
Resolve the e2e summary conflict by retaining the new ElevenLabs and
Google Generative AI scenarios while preserving removal of the deprecated
LangChain wrapper scenario.

Fix the Git metadata fixture to respect supplied author identity and the
selected forwarding project, as required by workspace validation.

Validation:
- Frozen-lockfile install, build, type checks, lint, and formatting passed.
- All 602 targeted unit tests passed.
- Full replay: 1669 passed, 8 skipped, and one Git fixture failure.
- The corrected Git fixture passed three reruns.
- All seven incoming scenarios passed three replay checks each.
- Verified production forwarding to tmp-luca-sdk-merge-20260911-seattle.
- Verified 111 of 126 full-run summary links; 15 have empty project-log
  filters from reporting gaps also present in origin/main. Repeated-run
  summaries each have 17 valid links and the same two reporting gaps.
- All new provider variant links and workflow experiment links are valid.
Resolve the e2e summary configuration conflict by retaining the new
LangGraph SDK scenario and preserving removal of the deprecated
LangChain wrapper scenario.

Validation:
- Frozen-lockfile install, build, types, lint, and formatting passed.
- All 154 targeted unit tests passed.
- Full e2e replay: 57 files, 1690 tests passed, 8 skipped.
- LangGraph SDK and changed helper coverage passed three times.
- Verified both published LangGraph links in all three replay summaries.
- Confirmed complete forwarded LangGraph traces, including final outputs,
  expected errors, and timing fields.
- Full summary: 113 valid links; the same 15 existing empty-result links
  reported during the previous merge remain. No new link gaps were found.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants