Skip to content

chore(deps): fix dependency-audit findings (#695) - #696

Merged
ajianaz merged 1 commit into
developfrom
chore/fix-dependency-audits
Oct 22, 2026
Merged

ajianaz merged 1 commit into
developfrom
chore/fix-dependency-audits

Conversation

@ajianaz

@ajianaz ajianaz commented Oct 22, 2026

Copy link
Copy Markdown
Collaborator

What

Dependency-audit fixes: lockfile refreshes + targeted minor updates for the vulnerable packages; transitive advisories with no compatible fix get a documented, dated audit-ignore (.cargo/audit.toml).

Why

Closes #695. The Security audit gates have been red on develop (pre-existing; isolated during the fleet CLA retirement, uteke#1548). This PR makes the gates honestly green.

Testing

  • cargo audit before/after locally (advisory DB refreshed): remaining findings = none beyond the documented ignores
  • JS audits re-run locally; remaining lows documented (not gate-failing)
  • CI on this PR: all audit gates expected green

@ajianaz
ajianaz merged commit fbde347 into develop Oct 22, 2026
13 checks passed
@ajianaz
ajianaz deleted the chore/fix-dependency-audits branch October 22, 2026 14:38
ajianaz added a commit that referenced this pull request Oct 27, 2026
## What

Dependency-audit fixes: lockfile refreshes + targeted minor updates for
the vulnerable packages; transitive advisories with no compatible fix
get a documented, dated audit-ignore (`.cargo/audit.toml`).

## Why

Closes #695. The Security audit gates have been red on `develop`
(pre-existing; isolated during the fleet CLA retirement, uteke#1548).
This PR makes the gates honestly green.

## Testing

- `cargo audit` before/after locally (advisory DB refreshed): remaining
findings = none beyond the documented ignores
- JS audits re-run locally; remaining lows documented (not gate-failing)
- CI on this PR: all audit gates expected green

Co-authored-by: ajianaz <ajianaz@users.noreply.github.com>
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

chore(deps): fix dependency-audit failures (pre-existing on develop)

1 participant