Skip to content

DAOS-18777 test: combine daos_racer/multi and parallel (#18191)#18226

Draft
daltonbohning wants to merge 1 commit into
release/2.6from
dbohning/daos-18777-2.6
Draft

DAOS-18777 test: combine daos_racer/multi and parallel (#18191)#18226
daltonbohning wants to merge 1 commit into
release/2.6from
dbohning/daos-18777-2.6

Conversation

@daltonbohning
Copy link
Copy Markdown
Contributor

daos_racer/multi used to run for 2 hours with 1 process. daos_racer/parallel used to run for 10 minutes with 4 processes.

Update daos_racer/multi to run for 2 hours with 4 processes and delete daos_racer/parallel since it is redundant.

Test-tag: DaosRacerMultiTest
Skip-unit-tests: True
Skip-fault-injection-test: True

Steps for the author:

  • Commit message follows the guidelines.
  • Appropriate Features or Test-tag pragmas were used.
  • Appropriate Functional Test Stages were run.
  • At least two positive code reviews including at least one code owner from each category referenced in the PR.
  • Testing is complete. If necessary, forced-landing label added and a reason added in a comment.

After all prior steps are complete:

  • Gatekeeper requested (daos-gatekeeper added as a reviewer).

daos_racer/multi used to run for 2 hours with 1 process.
daos_racer/parallel used to run for 10 minutes with 4 processes.

Update daos_racer/multi to run for 2 hours with 4 processes and delete
daos_racer/parallel since it is redundant.

Test-tag: DaosRacerMultiTest
Skip-unit-tests: True
Skip-fault-injection-test: True

Signed-off-by: Dalton Bohning <dalton.bohning@hpe.com>
@daltonbohning daltonbohning self-assigned this May 12, 2026
@daltonbohning daltonbohning added clean-cherry-pick Cherry-pick from another branch that did not require additional edits forced-landing The PR has known failures or has intentionally reduced testing, but should still be landed. approved-to-merge PR has received release branch merge approval labels May 12, 2026
@github-actions
Copy link
Copy Markdown

Ticket title is 'ftest: combine daos_racer/multi and daos_racer/parallel'
Status is 'Awaiting backport'
Job should run at elevated priority (1)
https://daosio.atlassian.net/browse/DAOS-18777

@github-actions github-actions Bot added the priority Ticket has high priority (automatically managed) label May 12, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

approved-to-merge PR has received release branch merge approval clean-cherry-pick Cherry-pick from another branch that did not require additional edits forced-landing The PR has known failures or has intentionally reduced testing, but should still be landed. priority Ticket has high priority (automatically managed)

Development

Successfully merging this pull request may close these issues.

1 participant