Skip to content

docs: re-score adc ArchitectureScorecard + reconcile backlog (27th cycle) - #126

Merged
ivanball merged 1 commit into
mainfrom
docs/scorecard-20260823
Aug 23, 2026
Merged

docs: re-score adc ArchitectureScorecard + reconcile backlog (27th cycle)#126
ivanball merged 1 commit into
mainfrom
docs/scorecard-20260823

Conversation

@ivanball

Copy link
Copy Markdown
Owner

Twenty-seventh-cycle full 34-category re-score of MMCA.ADC at pin v1.160.0, HEAD 96f0919a (clean tree), driven by the two-pass update-scorecard workflow (26 rescored + 8 adversarially adjudicated, all eight proposed lifts rejected).

Score moves (both down, implementation axis):

  • S4 Domain-Driven Design I 9->8: public-setter cross-aggregate navigations (Session/Sponsor/Activity), aggregate-external validation of Event optional fields, OrganizerContactEmail as raw string vs the Email VO used elsewhere.
  • S22 Responsive & Cross-Browser I 8->7: zero density-option adoption, partial content reflow on the 17 non-DataGrid table pages (names the previously unidentified lever).

Indices: Maturity 97.2% (311/320, unchanged) / Implementation 85.6% -> 85.0% (680/800), re-summed independently.

Backlog: no closures; S4 enters the implementation band (implPriority 3), S22 rises to joint top (4) with S15; new TD-20 records the conditional e2e-gate (UI-affecting diffs only, skipped gate accepted by deploy) with a matching Deliberate/accepted amendment; "gates every deploy" integration-tier wording corrected to PR-gating at six spots; TD-16 re-measured (band widened to eight files, two at 398); pin/anchor provenance refreshed (v1.160.0, ADR set 001-096, bicep :1648).

Docs library rebuilt (npm run build) and regenerated output committed in the same PR.

🤖 Generated with Claude Code

https://claude.ai/code/session_016usKhixm2drfHmwmmmqwbn

…cle)

Twenty-seventh-cycle full 34-category re-score at pin v1.160.0, HEAD 96f0919a.
Two implementation down-moves: S4 DDD 9->8, S22 Responsive 8->7. Eight proposed
lifts adversarially rejected. Indices: Maturity 97.2% (unchanged) /
Implementation 85.6% -> 85.0% (680/800). Backlog: S4 enters the implementation
band, S22 joins S15 at the top, new TD-20 (conditional e2e-gate) with a
Deliberate/accepted amendment, integration-tier "gates every deploy" wording
corrected to PR-gating, TD-16 re-measured (eight files in the 38-line band).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_016usKhixm2drfHmwmmmqwbn
@ivanball
ivanball merged commit 9dd93fb into main Aug 23, 2026
3 checks passed
@ivanball
ivanball deleted the docs/scorecard-20260823 branch August 23, 2026 14:29
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant