Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
2 changes: 1 addition & 1 deletion .agents/skills/async-first-communication/SKILL.md
Original file line number Diff line number Diff line change
Expand Up @@ -25,7 +25,7 @@ the work. A task is not done until its state is readable asynchronously.

| What | Where |
|---|---|
| Current WIP + goals snapshot (cold-start entry) | `STATUS.md` at repo root — links only, updated in the same commit as the state change |
| Current WIP + goals snapshot (cold-start entry) | `STATUS.md` at repo root — links only, updated in the same commit/PR as the state change |
| Decision / groomed design / vote | the project's docs (`docs/projects/<id>/`), with rationale |
| Task status + claims + handoffs | kanban board (`kanban-md`, local) AND the committed snapshot (project `backlog.md` State section) |
| Operational state across sessions | the project runbook (statuses + handoff notes pasted VERBATIM) |
Expand Down
16 changes: 16 additions & 0 deletions .okf/log.md
Original file line number Diff line number Diff line change
Expand Up @@ -79,6 +79,22 @@ Also corrected: the ~1e-6 noise figure in test-gates and in the code comment
was macOS-local and read as universal. Same overclaim shape the #566 reviewer
caught one layer down.

## 2026-08-22 - STATUS.md round two: the surface broke its own rule on commit one

A clean-context peer reviewer (second, independent 4-eyes pass after the
in-session reviewer's 5-round PASS) failed the merged surface: STATUS.md
called 2509 "Phase D dormant" because it copied the tracker's line-6 header -
which still said "Phase C complete" while line ~700 recorded PROJECT COMPLETE
2026-07-19. The file violated its own "verify against the artifact, never a
tracker line" header rule on its first commit, written by the rule's author.
Lesson reinforced, not new: a stale header is a tracker line too - read the
file's END (newest state) before quoting its top. Also fixed on the same pass:
STATUS.md was absent from the two session-start docs (BASE_HANDBOOK,
flow-router - the exact path meant to discover it), flow-router still called
the LIVE ICP campaign "PAUSED", and the AGENTS.md read-order rewrite had
dropped two resolvable pointers (PROJECT-INDEX.md, 40.10 health reports)
under a note that only justified deleting the phantom `.agent/` ones.

## 2026-08-22 - STATUS.md is the repo's cold-start surface

Paul asked for a way for anyone landing in the repo to know the goals and the
Expand Down
3 changes: 2 additions & 1 deletion AGENTS.md
Original file line number Diff line number Diff line change
Expand Up @@ -46,9 +46,10 @@ onboarding path:

**First visit — read in this order:**
1. `STATUS.md` (repo root) — cross-project view: what's in flight, goals, blockers
2. The project's `README.md` or `GOAL-AT-A-GLANCE.md` — one-page status / exec summary (2608's README is the template: status paragraph, read-order table, open decisions, known reds)
2. The project's one-page entry: `README.md`, `GOAL-AT-A-GLANCE.md`, or `PROJECT-INDEX.md` — whichever exists (2608's README is the template: status paragraph, read-order table, open decisions, known reds)
3. `TASK-TRACKER.md` or `backlog.md` — live task queue, active phase

**Project health** (where present): PM health reports in `40-49-review/40.10-*.md` (e.g. 2605).
(The former `.agent/STATUS.md` / `.agent/prd/PRD.md` / `.agent/tasks.json` stack never existed in this repo — removed 2026-08-22; root `STATUS.md` is the cross-project dashboard.)

**Skills:** Project-specific skills in `.skills/`. Global skills loaded via
Expand Down
2 changes: 1 addition & 1 deletion CLAUDE.md
Original file line number Diff line number Diff line change
Expand Up @@ -6,7 +6,7 @@
>
> **Company FACTS are NOT vault-owned.** Every claim in `.okf/content/claims-canon.md` is canon HERE, enforced by `test/unit/marketing_copy_test.rb`. Never copy a company number out of a vault note into published copy (the vault itself carried two banned strings on 2026-08-17). The vault decides what we're doing; the canon decides what we're allowed to say.

**What's in flight + goals**: `STATUS.md` at repo root — the cold-start surface; update it in the same commit as any WIP change (rule in §Behavioral Constraints).
**What's in flight + goals**: `STATUS.md` at repo root — the cold-start surface; update it in the same commit/PR as any WIP change (rule in §Behavioral Constraints).

**Type**: Hugo static site blog | **Build**: `bin/hugo-build`
**Test**: `bin/qtest --changed` (per change — tests the pages your diff touches) / `bin/test --smoke` (fixed 17-test core net, ~50s / ~30s CI) / `bin/rake test:critical` (milestones) / `bin/test` + `bin/dtest` (PR prep). qtest and smoke are complementary: qtest follows your diff, smoke is a constant basics check.
Expand Down
12 changes: 6 additions & 6 deletions STATUS.md
Original file line number Diff line number Diff line change
Expand Up @@ -10,28 +10,28 @@
## Goals

- **Company goals / OKR / weekly numbers**: vault `~/Documents/pkm/jt-operations.md` (host-only — vault owns operations; this repo carries growth/marketing execution).
- **Bet of record**: Vibe Code Rescue — status is vault-owned (`jt-vcr-runbook.md`; repo mirror [`docs/business/index.md`](docs/business/index.md)); campaign artifacts in [`docs/projects/2607-vibe-code-rescue/`](docs/projects/2607-vibe-code-rescue/backlog.md).
- **Bet of record**: Vibe Code Rescue — **Parked until Sept 2026** per the repo mirror [`docs/business/index.md`](docs/business/index.md) (vault `jt-vcr-runbook.md` is authoritative); campaign artifacts in [`docs/projects/2607-vibe-code-rescue/`](docs/projects/2607-vibe-code-rescue/backlog.md).
- **Content plan of record**: [`20.09 (Aug 2026)`](docs/projects/2510-seo-content-strategy/20-29-strategy/20.09-content-plan-revision-aug-2026.md) — its §1 governing constraint: **outreach outranks new posts**.

## Now / WIP

| Workstream | State | Next step | Entry point |
|---|---|---|---|
| LinkedIn (primary demand lane) | **LIVE** — 3 posts published (2026-08-13/18/19), first metrics read 2026-08-20; ICP-E lane on disk: 1 posted + 4 approved (of 10 planned), validation clock running | Post an approved draft (week1-tue / week1-wed) at Stream 0 cadence (3-4/wk) | [`metrics-ledger`](linkedin-posts/metrics-ledger.md) · [`plan`](docs/workflows/linkedin-icp-validation-plan.md) |
| 2608 site design system (v2 `/next/` rail) | Paused 2026-08-22 mid-flight; 3 pilots built + voted | Apply 20.09 repositioned copy; then Paul's 5 decisions | [`2608 README`](docs/projects/2608-site-design-system/README.md) |
| 2608 site design system (v2 `/next/` rail) | Paused 2026-08-22 mid-flight; 3 pilots built + voted | Apply the [repositioned pilot copy](docs/projects/2608-site-design-system/20-29-strategy/20.09-repositioned-pilot-copy.md) (2608's own 20.09 — not the content plan); then Paul's 5 decisions | [`2608 README`](docs/projects/2608-site-design-system/README.md) |
| Blog / SEO (2510) | Constrained by 20.09 §1 (outreach first). R-queue empty/retired; replacement queue is §13 (restocked 2026-08-21) | Per §1: LinkedIn cadence + sourcing outrank a new post; when drafting, take §13 N-queue | [`20.09 §13`](docs/projects/2510-seo-content-strategy/20-29-strategy/20.09-content-plan-revision-aug-2026.md) |
| 2605 course | v2 live; measuring. Diagnosis: **arrival, not content** (GSC/GA/Clarity triple-read 2026-08-20) | Arrival/discovery actions per 50.05; no new funnel posts on the unproven bridge | [`TASK-TRACKER`](docs/projects/2605-tech-for-non-technical-founders/TASK-TRACKER.md) |
| 2605 course | v2 live; measuring. Diagnosis: **arrival, not content**; course SEO/AEO **closed** (Paul 2026-08-21) | LinkedIn arrival-test cards **LI-0…LI-D** in [`content-plan`](linkedin-posts/content-plan.md); no new funnel posts on the unproven bridge | [`TASK-TRACKER`](docs/projects/2605-tech-for-non-technical-founders/TASK-TRACKER.md) |
| 2607 campaign tasks | Cold-public-sourcing premise tested and **failed** (3 sweeps, 4 venues, 0 verified-fresh rows; Reddit still un-openable) | Sept-restart Paul decision: retire the cold lane or buy Reddit API access (backlog §c) | [`2607 backlog`](docs/projects/2607-vibe-code-rescue/backlog.md) |
| Test/CI hygiene | One known red (stale linux baseline, see 2608 README §Known red) | Diff record-vs-test build paths before re-recording | [`test-gates`](.okf/build/test-gates.md) |
| Test/CI hygiene | One known red (stale linux baseline) | Diff record-vs-test build paths before re-recording | [`2608 README §Known red`](docs/projects/2608-site-design-system/README.md) |

**Not in flight**: 2604 typography — closed 2026-08-08 (P2 leftovers re-homed). 2509 CSS migration — Phase C complete 2026-07-19, Phase D backlog dormant; the 2608 clean-slate rail is the live CSS strategy ([ADR-0006](docs/adr/0006-clean-slate-dual-run.md)).
**Not in flight**: 2604 typography — closed 2026-08-08 (P2 leftovers re-homed). 2509 CSS migration — **project complete 2026-07-19** (tracker in maintenance mode; the dormant remainder is the Phase-E groomed backlog + trigger-conditioned items); the 2608 clean-slate rail is the live CSS strategy ([ADR-0006](docs/adr/0006-clean-slate-dual-run.md)).

## Blocked on Paul

| What | Where the full ask lives |
|---|---|
| Five 2608 decisions (register pick, 3 claims, first page, legacy CTO sweep, Sept measurement gate) | [`2608 README`](docs/projects/2608-site-design-system/README.md) |
| **Joy Adamson override** (1 min; only survivor of outreach batch 1, still publicly unanswered) | [`20.09 §1`](docs/projects/2510-seo-content-strategy/20-29-strategy/20.09-content-plan-revision-aug-2026.md) desk table + 2607 backlog card #12 |
| **Joy Adamson override** (1 min; Paul's one override candidate from outreach batch 1, still publicly unanswered) | [`20.09 §1`](docs/projects/2510-seo-content-strategy/20-29-strategy/20.09-content-plan-revision-aug-2026.md) desk table + 2607 backlog card #12 |
| Three 2605 fabricated-fact findings (five-tech-words client claim, $78K/$400 story, SVG chart stats) | [`2605 TASK-TRACKER`](docs/projects/2605-tech-for-non-technical-founders/TASK-TRACKER.md) §Aug-20 sweep |
| 2607 T3 (Gmail warm-source consent) + T10 (split strategy docs, [#449](https://github.com/jetthoughts/jetthoughts.github.io/issues/449)) | [`2607 backlog`](docs/projects/2607-vibe-code-rescue/backlog.md) |

Expand Down
2 changes: 1 addition & 1 deletion docs/projects/2509-css-migration/TASK-TRACKER.md
Original file line number Diff line number Diff line change
Expand Up @@ -3,7 +3,7 @@
**Purpose**: Status tracking for the CSS maintainability goal — FL-Builder export CSS retired page-by-page (strangler rewrites)
**Update Frequency**: After each sprint or status change
**Last Updated**: 2026-07-19
**Current Phase**: ✅ PHASE C COMPLETE (2026-07-19) - C1 #371 · C2 #372 · C3 #374 · C4 #375 · C5 dedup. Phase D backlog defined below.
**Current Phase**: ✅ **PROJECT COMPLETE (2026-07-19)** — see §PHASE D COMPLETE below; tracker in maintenance mode, Phase-E groomed backlog + trigger-conditioned items dormant. *(Header corrected 2026-08-22 — it still said "Phase C complete, Phase D backlog defined" long after line ~700 recorded Phase D done; the stale header was copied into STATUS.md's first commit, exactly the failure the artifact-not-tracker-line rule exists for.)*

---

Expand Down
3 changes: 3 additions & 0 deletions docs/workflows/BASE_HANDBOOK.md
Original file line number Diff line number Diff line change
Expand Up @@ -17,6 +17,9 @@ Use this as the shared boilerplate for agents and skills. Keep agent/skill files
2. `Search the codebase at <repo root>/knowledge for: "[topic]"`
3. `Get library docs for "[framework]"`

## Current WIP + goals (repo state)
**Read `STATUS.md` at the repo root at session start** — the cross-project cold-start surface (goals, WIP, blocked-on-Paul, links only). Any session that changes what's in flight updates it in the same commit/PR.

## Business layer (company state)
**All operations live in the vault** (`~/Documents/pkm`, host-only; Paul 2026-08-20): goal/OKR/rocks/weekly numbers in `jt-operations.md`, identity/positioning/bet status in `jt-business-os.md`, the bet's execution entry point in `jt-vcr-runbook.md` **▶ START HERE**. This repo carries growth/marketing campaigns only; `docs/business/` holds pointer stubs.

Expand Down
3 changes: 2 additions & 1 deletion docs/workflows/flow-router.md
Original file line number Diff line number Diff line change
Expand Up @@ -3,10 +3,11 @@
Read this at session start to route tasks to the right workflow without explicit user notice.

## Routing Rules
- **"What's in flight / current WIP / goals / project status?"** → repo root `STATUS.md` (cross-project cold-start surface; update it in the same commit/PR as any WIP change)
- **Outbound / sales / pipeline / prospect / discovery-call work (2607)** → vault `~/Documents/pkm/jt-vcr-runbook.md` **▶ START HERE** (moved 2026-08-20; bet PARKED until Sep 2026; campaign artifacts stay in `docs/projects/2607-vibe-code-rescue/`)
- **Weekly loop (goal, OKR, rocks, weekly numbers)** → vault `~/Documents/pkm/jt-operations.md` (moved 2026-08-20; vault = operations, repo = growth/marketing). Host-only — out of scope in container/CI sessions.
- **Identity, positioning, bet status** → the vault note `jt-business-os` (`~/Documents/pkm`) FIRST, then reflect into the `docs/business/` mirror
- LinkedIn post creation or edits, especially `linkedin-posts/**` → `@docs/workflows/linkedin-post-pipeline.md` (it routes to the active campaign plan — check the campaign's status banner; the ICP campaign is currently PAUSED)
- LinkedIn post creation or edits, especially `linkedin-posts/**` → `@docs/workflows/linkedin-post-pipeline.md` (it routes to the active campaign plan — check the campaign's status banner; the ICP campaign is LIVE since 2026-08-18, see `linkedin-posts/metrics-ledger.md`)
- Content creation or edits → `@docs/workflows/blog-pipeline.md` (mandatory; its P0 gate can halt content entirely)
- Cover image work → `docs/workflows/cover-images.md` and `.stitch/design.md`
- Image/cover requests (even without content) → `@docs/workflows/cover-images.md` and `@.stitch/design.md`
Expand Down
2 changes: 1 addition & 1 deletion docs/workflows/linkedin-icp-validation-plan.md
Original file line number Diff line number Diff line change
Expand Up @@ -2,7 +2,7 @@

> **Status: READY TO ACTIVATE (2026-08-08)** — 3 of 10 posts drafted, zero posted; the 2-week window starts when **Paul posts #1 from [`linkedin-posts/icp-validation/POSTING-PACKET.md`](../../linkedin-posts/icp-validation/POSTING-PACKET.md)** (copy, paste, post — nothing else). This campaign is now the **PRIMARY demand lane** (OS Rock 1, re-weighted 2026-08-08 after the warm-names premise fell). When live, cadence fits inside 20.09 §7's **Stream 0 total of 3-4 posts/week** (shared with course-promo) — not the original 5/week. The hypotheses, hooks, and reply-keyword CTAs below remain the campaign design of record.

> **Update 2026-08-22:** posting is LIVE — the status line above ("zero posted") is superseded. `linkedin-posts/metrics-ledger.md` carries three posted rows (2026-08-13, 08-18, 08-19; first metrics read 2026-08-20), including `week1-mon-jira-not-progress` from this campaign's own lane, so the validation clock is running.
> **Update 2026-08-22:** posting is LIVE — the status line above is superseded on both counts: "zero posted" (three posted rows in `linkedin-posts/metrics-ledger.md`: 2026-08-13, 08-18, 08-19, first metrics read 2026-08-20, including `week1-mon-jira-not-progress` from this campaign's own lane the validation clock is running) and "3 of 10 posts drafted" (lane on disk: 1 posted + 4 approved, measured from frontmatter `status:` fields).

**Purpose:** Validate whether LinkedIn can surface and qualify ICP-E: non-technical founders who feel stuck with a dev shop, freelancer, offshore team, or AI-heavy build they cannot evaluate.
**Window:** 2 weeks from first post (clock starts when Paul posts #1)