Skip to content
Merged
Show file tree
Hide file tree
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
2 changes: 1 addition & 1 deletion docs/architecture/rfcs/README.md
Original file line number Diff line number Diff line change
Expand Up @@ -188,7 +188,7 @@ failure leaves the generated files untouched.
- [Shared Goal Alignment and Governed Amendment Protocol v0](shared-goal-alignment-and-governed-amendment-v0.md)
([中文版](shared-goal-alignment-and-governed-amendment-v0.zh-CN.md))
- **Delivery on `main`:** Stage 1/2 read-only alignment and proposal-admission
foundations implemented; the RFC remains a draft.
foundations implemented; Stage 3+ remains unshipped.
- **Current boundary:** Current Todo/lease source-basis projection and retained
amendment admission have no canonical effect. Full Goal-intent versioning,
governed commit policy/verifier, lease-impact handling and Stage 3+
Expand Down
6 changes: 6 additions & 0 deletions docs/architecture/rfcs/TEMPLATE.md
Original file line number Diff line number Diff line change
Expand Up @@ -40,6 +40,12 @@ answer), and a `Superseded` RFC must link its successor that reciprocally names
its predecessor. Normative checkpoint persistence/recovery headings and
historical appendix records are legal.

`Delivery maturity: Proposal` means that implementation has not shipped; it
does not make an Accepted RFC a draft. In the README's delivery column, name
the implemented slice and remaining delivery boundary. Keep lifecycle state
in the canonical header and generated index rather than describing a merged
active RFC as Draft or Under review in delivery prose.

---

## 1. Decision summary
Expand Down
Loading