Repository navigation
docs: align design, ADRs and governance with 2026-10-23 scope decisions - #6
Merged
Merged
Conversation
Record the decisions from the design review and planning discussion: order-to-pay stays in ERP (ADR-0008), core-first with pack admission criteria and a customer layer (ADR-0009), and the v0.1-v0.7 route. - Add ADR-0008, ADR-0009 and docs/engineering (modelling rules, CI gates, test and versioning strategy); record verification results on ADR-0001/0002/0003/0006/0007. - Rewrite design docs 01-07 for the 27-object core: delivery records replace receipt/inspection, ERP integration points become reserved, approval matrix in 03 s12 is the single source, material class A/B/C on srm_category, versioned route with two gates and platform dependency results. - Mark packs as "design kept, not scheduled", add admission criteria and dependency order, drop bridges for now. - Align ZC-02, QP-01 appendix C and GL-02 appendix A with the approval matrix; add position names to org.example.yaml; parameterise admission and change review deadlines; soe-conditional expert pool in GL-02 7.2. - Update AGENTS.md, README and docs/README for the new scope. Claude-Session: https://claude.ai/code/session_011FUtVGdJNj6NEXtstKJDNQ Co-authored-by: Claude <noreply@anthropic.com>
…g phase wording Self-review of PR #6 found the risk control matrix (ZC-03) still scheduling controls by the old phases 一期–四期. Map each control to the v0.1–v0.7 route, mark ERP-owned controls as not in SRM, and replace the two remaining "第 0 期" / "二期" mentions in 01 and 04. Claude-Session: https://claude.ai/code/session_011FUtVGdJNj6NEXtstKJDNQ Co-authored-by: Claude <noreply@anthropic.com>
Resolve README, 02 and 07 against the 2026-10-23 route: keep the v0.1–v0.7 table, drop the superseded 07 §1.1 split (portal at v0.2, sourcing at v0.3), keep the v0.1 subset notes from #5 with versions re-pointed. Claude-Session: https://claude.ai/code/session_011FUtVGdJNj6NEXtstKJDNQ Co-authored-by: Claude <noreply@anthropic.com>
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
背景
2026-10-23 设计审核与开发计划讨论的结论落到仓库文档。只改文档、模板和参数定义,不改代码。
改了什么
srm_delivery_record替代收货/检验,ERP 集成点预留、门户镜像在集成后建)和 ADR-0009(先做核心包;扩展包准入标准与接入规则;客户个性化放客户层;核心 API 名冻结)。ADR-0001/0002/0003/0006/0007 补「验证结果」与「补充说明」。docs/engineering/README.md:建模规范(谓词不穿引用、不含role、stageField 内联、空值安全唯一、跨记录规则走 screen flow)、分支与 PR、CI 门禁、测试策略、版本与升级。org.example.yaml增加position.*岗位称谓;GL-01/GL-04 的硬编码时限参数化(新增admission_approval_days、change_review_days);GL-02 7.2 专家库加pack:soe条件;README 状态行与编写计划按版本重排。需要确认的两处默认
计划决策 P-D1、P-D2 按建议先行,若不同意请在评审中指出:
srm_category.material_class,决定质量经理会签、现场审核频次、绩效周期。根 README 的「当前状态」与 PR #5 可能有冲突,以本 PR 的版本表为准合并即可。
校验
python3 governance/scripts/build.py --check与--check --packs bulk,hazmat,soe均通过(12 个文件,待确认 0 项)。审核意见处理状态(F-01–F-29)
srm_category.material_class(P-D2 待确认)source = internal,03 §3 内部代录差异is_mandatory无对应 flowsrm_supplier_qualification_recalcduplicate_check = reapply,旧档续用contact_role触犯保留词contact_function,AGENTS.md 命名规则public_read+ FLS(v0.7)portal_position回填min_bidders、tech_weight_max;另两项为制度要求pack:soe条件块admission_approval_days、change_review_days参数化;其余保留为制度文本sourcing_type内联选项srm_sourcing_type(v0.7)portal_positionbuild.py改动随 v0.2 工程 PRGenerated by Claude Code