Skip to content

chore(release): align Knowledge with Interface 0.49 - #125

Merged
drewstone merged 1 commit into
mainfrom
chore/interface-049-peer
Aug 13, 2026
Merged

chore(release): align Knowledge with Interface 0.49#125
drewstone merged 1 commit into
mainfrom
chore/interface-049-peer

Conversation

@drewstone

Copy link
Copy Markdown
Contributor

Release Knowledge 7.2.5 on the current shared contract cohort.

  • Eval 0.145.10
  • Core 0.7.1 through Eval
  • Interface 0.49.0

Proof:

  • lint passed on 207 files
  • type checks passed
  • 558 tests passed and 12 skipped
  • package verifier installed one physical Eval, Core, and Interface copy
  • official GEPA and SkillOpt packed-package integration passed
  • frozen install passed

@tangletools tangletools left a comment

Copy link
Copy Markdown
Contributor

Choose a reason for hiding this comment

The reason will be displayed to describe this comment to others. Learn more.

✅ Auto-approved drewstone PR — 9e6a8113

This PR was opened by the trusted drewstone account.
The full PR reviewer audit still runs separately and will publish findings if it detects issues.

This approval is provisional. It rests on the audit running. If the audit cannot run — for example the CLI bridge rejects it — this approval is dismissed rather than left standing, so an unrun check never reads as a passing one.

tangletools · auto-approval · reason: drewstone_author · 2026-08-13T22:31:05Z

@drewstone
drewstone merged commit 1219f1c into main Aug 13, 2026
2 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants